State Manor Apartments, Coraopolis, PA
Intellihot’s Units Warm Up the Residents of This Apartment Building
The residents of this popular apartment complex were tired of experiencing failures caused by an old boiler and tank system. The management company was tired of worrying about the implications of no backup system. Intellihot provided a tankless option that offered peace of mind for both parties.
Overview
Type
Multi-Family Retrofit
Property Details
10 Floors
100 Apartments
Product Installed
Five iQ251s
Installed Capacity
1,250,000 BTU/hr Zero Gallons storage
This 10 storey, multi-family property was built in 1974 and changed ownership most recently in May 2016. The transaction did little to change the services it offers to its renters. Residents at this rental housing complex enjoy the benefits of city living with a convenient location just minutes from downtown Coraopolis. The property offers spacious one and two bedroom apartment homes and grants affordable prices. The facility also presents the advantages of a safe neighborhood near great schools with high ratings. Those who wish to build a home and raise a family in Pittsburgh can achieve their dreams through this budget rental housing community.
The Challenge
The property was relying on a small, aging boiler paired with a 1,000 gallon storage tank to handle 100 apartment units. Not only was the boiler cycling 24/7 and suffering efficiency losses, it was beginning to experience failures. With no backup system in place, the complex was running on borrowed time.
The Intellihot Solution
Five iQ251’s were cascaded together for masterless redundancy to relieve the property of its growing problem with failures. The independent units operate as an integrated system and eliminate the risk of a complete breakdown. The management company can rest easy knowing Intellihot has its residents covered.